House Progress - Late September







The house, as you well see from the following pictures, is progressing well. Pictures here showing soak pit, septic tank hole, ceilings ready for plastering, wiring being put into the walls and the floors being filled with large rocks, that are then smashed up, to fill up the foundation prior to sand being laid on top and then the concrete floor being laid.