Plaster outside

Tuesday 19th January

takes a load of labour to get the concrete for the surfeit and ceiling done
the concrete is mixed othe ground, loaded by shovel into a cut out jerry can then lifted
on the end of rope onto the roof where one guy tips it on to the netting and the other guy trowels
it